/content/sps/au/en/search-results.html
    Important Information: Now Live Introducing the new myAutomation experience! For site support, contact myAutomation@honeywell.com. Thank you for choosing Honeywell! Click here to get started.

    Technical and Application Notes

    Application Notes

    AP-000: RAE Systems PID Training Outline
    AP-200: PIDs And Aircraft Wing Tank Entry
    AP-201: Measuring Ammonia (NH3) with Photoionization Detectors (PIDs)
    AP-202: The ABC's Of Gases In The Industry
    AP-203: PIDs as a HazMat Response Tool
    AP-204: Pulp & Paper: Measuring Turpentine & ClO2
    AP-205: Measuring Heat Transfer Fluids with a PID
    AP-206: Guide To Atmospheric Testing In Confined Spaces
    AP-207: PIDs As Arson Investigation Tools
    AP-211: PIDs for Continuous Monitoring of VOCs
    AP-212: Using PIDs For Indoor Air Quality (IAQ) Surveys
    AP-214: Environmental Applications For PIDs
    AP-215: Gas Detection in the Marine Industries
    AP-216: Using PIDs in Terrorist Chemical Attacks
    AP-217: Confined Spaces And The Construction Industry
    AP-218: Measurement Of Fumigants In The Food Storage Industry
    AP-219: Using PIDs For 10% Of LEL Decisions
    AP-220: Using PIDs In Clan Lab Investigations
    AP-221: Using PIDs to Assess Exposure Risk in Unknown Environments
    AP-222: Carbon Monoxide & Natural Gas Detection For Fire Department Engine Companies
    AP-226: Comparison of Photoionization Detectors (PIDS) and Flame Ionization Detectors (FIDS)
    AP-227: Using AreaRAEs For Fenceline Monitoring
    AP-228: Facility and Venue Protection
    AP-229: AreaRAES for Incident Response & Law Enforcement
    AP-231: AreaRAE Inert For Inert Gas Confined Space Entry
    AP-232: Radioisotopes in Everyday Life
    AP-233: Wireless Mesh Gas Detection For Oil And Gas Exploration
    AP-235: Measurement of PGMEA Using Photoionization Detector
    AP-236: Benzene Application Note
    AP-237: Multi-Point VOC Measurement System Using PIDS for Process Safety
    AP-238: Toxic Twins (HCN & CO) In Fire Overhaul Application Note

    AP-RAE Sep Tube Warning
    Safety Advisory - ToxiRAE Pro, QRAE 3, MultiRAE Series, AreaRAE Plus/Pro and MeshGuard EC

    Technical Notes

    TN-106 A Guideline for PID Instrument Response
    TN-112: Exporting Datalogged Data to Microsoft Excel
    TN-114 Sensor Specifications and Cross-Sensitivities
    TN-118: Using RAE Systems PIDs For Measuring Soil Headspace And In Soil Vapor Extractions
    TN-119: Calculating STEL, TWA, MIN, MAX, and Average Values for ToxiRAE PIDS
    TN-120: Measuring PID Correction Factors for Volatile Compounds with RAE Systems Instruments
    TN-121: CO Sensor Cross-Sensitivity and Removal with a Charcoal Filter
    TN-122: Compliance Of RAE Systems PIDs With EPA Method 21
    TN-123 Special Diagnostic Modes for RAE Systems Instruments
    TN-124: PID Lamp Characteristics
    TN-125: Creating Custom Correction Factors and Gas Names For The ToxiRAE II PID
    TN-126: Interchangeability of Sensors In PGM-35 and PGM-50
    TN-127: Benzene-Specific Measurements In Petroleum Hydrocarbons Using The RAE Systems UltraRAE
    TN-128: Formaldehyde (HCHO) Sensor
    TN-130 Setting Alarm Limits for Mixtures
    TN-132: Upgrading Firmware On RAE Systems Instruments
    TN-133: Methylene Chloride-Specific Measurements Using the UltraRAE
    TN-136: UltraRAE Operation Tips
    TN-140: The Effect Of Extension Tubing Volume And Vacuum On Sample Flow For RAE Systems Instruments
    TN-141: Monitor Remote Control Functions
    TN-142: MiniRAE 2000 & MultiRAE Pre-Preprogrammed Compound Libraries
    TN-143: Accuracy Comparisons Of RAE Systems Gas Detection Tubes
    TN-144 Handling LEL Sensor Poisons
    TN-146: Turning on UV Lamps in a PID Monitor
    TN-147: UltraRAE Butadiene-Specific Measurements
    TN-148 Defining the Interval Between Calibration Checks
    TN-150: Understanding and Operating the ppbRAE 3000
    TN-151: Electrochemical Sensor Replacement & Maintenance
    TN-152 Effects of Operating Conditions on Oxygen Sensors
    TN-153: TC (Vol%) Sensor Applications and Correction Factors
    TN-156 Correction Factors for Combustible Gas (LEL) Sensors
    TN-157: Moisture Exchange Tubes for Humidity Control of Test Gases
    TN-158: Conversion of PID Readings to Methane Equivalent or Hexane Equivalent FID Response
    TN-159: Chemical Warfare Agent Measurements by PID
    TN-161: Intrinsic Safety and Hazardous Locations
    TN-162: Use of C-Filter Plugs
    TN-163: Addressing MiniRAE 2000 Moisture Sensitivity
    TN-165: Combating Drift in Portable and Fixed PIDs
    TN-166: Lithium-Ion Batteries
    TN-167: Proper Use of Dilution Fittings on Pumped Monitors
    TN-169: Theory And Operation Of NDIR Sensors
    TN-170: USB To Serial Port Adaptor
    TN-172: Measurement Accuracy and Consistency of the ppbRAE
    TN-173: Operation Guide For Demand-Flow Regulators For Calibration Gases
    TN-174: Decontamination Procedures for Monitors Exposed to Chemical Warfare Agents
    TN-176: Basics of Nuclear Radiation
    TN-177: ITRAP Certification of Radiation Monitors (Illicit Trafficking Raditaion Assessment Program)
    TN-178: Humidity Filtering II Tube for PID Measurements in Humid Environments
    TN-179: Effect Of Methanol And Glycols On Water Vapor Tubes
    TN-180: SPE (Solid Polymer Electrolyte) Oxygen Sensor
    TN-181: Managing Large Datalog Files In ProRAE Remote
    TN-182: Basics of Wireless Security
    TN-183: ProRAE Remote Host Controller: Communication Troubleshooting Guide
    TN-184: EntryRAE Duty Cycling
    TN-185: Response Guidelines for Inadvertent Movement or Illicit Trafficking of Radioactive Material
    TN-187: InstallatIon and Maintenance of a RaeGuard PID
    TN-189: MeshGuard Hazardous-Area Certifications
    TN-190: Monitor Remote Control Functions for MultiRAE
    TN-201: Gases for HCL and HF Sensor Calibration and Bump Testing
    TN-202: Procedure For Ppb Level VOC Detection With MultiRAE
    TN-203: Gas Sequences For Calibration And Calibration Check Testing Of The MultiRAE Instrument Family
    TN-204: Modes and Applications for the MULTIRAE Benzene
    TN-205: Correction Factors for Combustible Gas (LEL) Sensors (for EMEA Only)
    TN-206: Extending Life of LEL Sensors in Field Conditions

    Technical Bulletins

    TB-4: Facepiece Cleaning Procedure
    TB-26: Mandatory Retrofit Of 910150 Cap And Chain Accessory For Use On Mark 2 Style SCBA’S
    TB-38: Mark 2 Gauge Line
    TB-40: “Sticky” Exhalation Valve On The Mark 2 Mask
    TB-47: Improved Mark 2 Alarm Performance
    TB-48: Inspection Of Mark 2 Low Pressure Hose Quick Disconnect On All Models
    TB-49: Corrosion Control Of Alarm Assemblies Used On The XL/Mk-1/SAR Systems
    TB-56: SCBA Cold Weather Maintenance
    TB-57: Survivair SCBA Quick Connects
    TB-58: Low Pressure Hose Clamps On SCBA Units
    TB-60: Low Pressure Hose Clamps On SCBA Units
    TB-62: Christo-Lube
    TB-65: SCBA Used In Excessive Heat Or Flashover
    TB-67: Identifying SCBA Approvals
    TB-68: Mark 2 SCBA/SAR Second Stage Regulator Parts
    TB-73: Mark 2 Over-The-Shoulder (Ots) Gauge Hose
    TB-78: Dip Tube, P/N 921021, Reinstallation Procedure
    TB-82: Luxfer Technical Bulletin Entitled “Composite Cylinder Safety Notice”
    TB-85: Salvage-Master Wet Vacuum
    TB-87: Change To Maximum Operating Pressures For Survivair P/N 981200 (Tc-19C-269) Constant Flow Type C Supplied Air Respirator
    TB-88: SCBA Cold Weather “Freeze-Up”
    TB-92: Replacement Of O-Rings In Sigma SCBA
    TB-98: Storage Procedures For Survivair SCBA
    TB-100: Smalltalk Voice Projection Unit, Speaker Grill Re-Attachment
    TB-101: Twentytwenty-Style Facepiece Headnet Installation And Orientation Procedures
    TB-102: Lubricants, Cleaners And Adhesives
    TB-103: Cylinder Filling Procedure
    TB-104: Marking Of Life Support Product Components
    TB-105: Panther SCBA Serial Numbers
    TB-107: Smalltalk Voice Projection Unit For Twentytwenty Facepiece, Speaker Grill Reattachment
    TB-108: Inspection And Replacement Procedures For Luxfer SCBA Hoop-Wrapped Aluminum-Lined Cylinders Manufactured From 6351-T6 Alloy
    TB-109: Improper Smalltalk Battery Installation
    TB-111: Adam Function Buttons & Gauge Line Torque Procedure
    TB-112: XL-30 Regulators
    TB-113: Procedure For Changing From Non-Locking Cylinder Valve Handwheel To The Locking Collar Style Cylinder Valve Handwheel
    TB-114: Twentytwenty Plus Radio Communication System And Smalltalk Plus Amplifier Pin Replacement Kit, P/N 980126
    TB-115: Adam Repair Cost And Gauge Line Torque Procedure
    TB-116: First Stage Cap Screw Loctite And Torque Procedure
    TB-117: Trigger Pin Lubricant
    TB-118: XL Series Of SCBA
    TB-119: Panther Plain Whistle & Warbling Whistle Alarm Cap Sound Level Test Procedures
    TB-119a: Panther And Sigma Alarm Sound Level Adjustment Fixture Kit P/N 997024
    TB-122: Panther And Cougar Second Stage Regulator Outlet
    TB-123: 905700 Portable Test Console
    TB-124: Survivair Respirator Overhaul Requirements
    TB-125: Cylinder Filling Procedure
    TB-126: Survivair Products That Require Batteries, Excluding APR & PAPR Products
    TB-127: Discontinuation Of The Use Of Never-Seez On Survivair Cylinder Valve Threads
    TB-128: Torque Specifications For SCBA Cylinders And Valve Assemblies
    TB-129: Torque Specifications For SCBA Cylinder And Valve Assemblies, Installation Instructions
    TB-130: All Survivair Products
    TB-131: Survivair Repair And Maintenance Class
    TB-132: NIOSH Approval Label Misprint on Panther and Cougar/Puma SCBA
    TB-133: Survivair SCBA, SAR Hip-Pac, And EBA Cylinder Valve Seat
    TB-134: Sperian/Survivair SCBA And SAR, Second Stage Regulator Fbo Nut Adhesive
    TB-135: Sperian/Survivair SCBA First Stage Regulator Adhesive Change
    TB-136: Gauge Accuracy
    TB-137: Warrior Electronic Repairs
    TB-139: Composite Cylinder Label Error
    TB-140: Omission From Second Stage Cleaning Section Of Warrior Operation Manual
    TB-142: Discontinuation Of Warrior Technician Training
    TB-143: Mandatory Upgrade Of Posichek3 Titanium Software To USB Software
    TB-144: Service Center Technician Certification/ Service Center Requirements
    TB-145: Modal Acoustic Emission Testing (MAE) For Cylinder Requalification From 15-Year Life To 30-Year Life.